Component Replacement after Deployment • Before doing any SRS repairs, use the GDS to check for DTCs.
Components 1. Supplemental Restraint System Control Module (SRSCM) 2. Gravity side impact sensor (G-SIS) _ C pillar 3.
Inspection 1. Measure the resistance between the terminals. 2. The measured resistance is not within specification, the blower resistor must be replaced. (After removing the resistor) Replacement 1.